@barbarawill68 Referring to your post 26/10/2015 at 20:24 Your comments about why haven’t I voiced an opinion on this site re DA2 and called for its delay show that you forget who started this post off in the first place, and who was amongst those that had leaflets printed and walked miles to inform residents of what was going on if the Planning Department and developers got their own way, a ...
@Lynne one of the jeffery's, not sure which one but i believe it's the same one that owns lady's mile.
They will get planning but hopefully not until the link road is in place, then all services, building material and cars will follow the link road. Which is what according to the original local plan should happen.
Councillors very much against access from the lane but decided that the application was premature in advance of the draft framework agreement and deferred the application until after it is signed off. Application is not objected to on the grounds of properties being built although we in the lane think it should be bungalows not houses. Problems also exist with the old problem of sewage. SWW have ...
Hope they got track and trace on their phone, because then the little s**t will get caught.
Right opposite two of the properties that have had sewage on their properties. How nice for them, I will keep saying it, all services should go out to the new link road including building traffic, sewage power and cars. It does not matter when building starts if the application goes ahead in its present form then the existing residents of the lane will have their lives disrupted when they do not ...
Oh and don't forget the regular escapes of sewage into Shutterton Brook because of the problems with the pipe in Exeter Road and the tank under the garden of Deodar this event also leads to sewage flooding properties at the lower end of the lane.
The sewage problem is three fold 1 The Strongvox site the tanks are to big and the pumps unreliable, still yet to be put right by Strongvox, basically the sewage in the tank rots when the pumps don't switch on and when they are manually switched rotten sewage is pumped into Secmaton Lane. 2 The pipe from the Bovis / Cavanagh site under the field of Secmaton Farm is the incorrect type and it ...
Wonder were the next load of houses are going to be built after 2033, next to Port Road maybe, and were is the starcross / Kenton bypass going to go.
There are at Least two sets that I know of near to Secmaton Lane Lynne and one that I have seen in the wood at the top of Warren Road.