Dawlish Town Council unanimously recommends refusal of a nine-home development proposal on Lower Dawlish Water Road due to concerns over traffic, flooding, parking, utility services, biodiversity, and impact on the rural area.
Dawlish Discussion
BUT IT IS OKAY FOR ENTIRE CRAPPY NEW BUILD ESTATES IN DAWLISH BETWEEN 1KM AND 2KM AWAY FROM THIS APPLICATIONS LOCATION IS FINE, OH I FORGOT THOSE ARE CORPORATIONS NOT A SMALL INDEPENDANT.
New Housing Developments in Relation to Shiverstone, Lower Dawlish Water Road
-
SWAN PARK – LANGDON HOSPITAL GROUNDS
Developer: Persimmon Homes
Number of homes: 200 (190 main scheme + 10 self-build plots) plus a 64-bed care home (sold to LNT)
Status: Essentially complete. Final 2 homes (detached 5-beds at £469,995 and £474,500) went on sale September 2026.
-
MANOR FARM – HOLCOMBE
Owner: Devon County Council (approx. 130 acres)
Number of homes: 160
Status: Planning appeal for "Land at Manor Farm and Slough" was being determined in June 2026 (Secretary of State's decision referenced the 2024/2025 NPPF). Site was previously dismissed as unsuitable in the HELAA, then re-emerged as a development option. Appeal outcome determines whether the 160 homes proceed.
-
DA2 URBAN EXTENSION – BETWEEN THE TWO SITES (GATEHOUSE FARM / SECMATON FARM)
Total allocation: 860 homes
Phase / Site: Gatehouse Farm (off Langdon Road / Secmaton Lane)
Homes: 354 (287 open market + 67 affordable)
Developer: Bloor Homes (149) + Taylor Wimpey (205, marketed as "Brook Vale")
Status: Full permission granted November 2023; under construction.
Phase / Site: Secmaton Farm (Area 3)
Homes: 201 (29 affordable)
Status: Conditional permission March 2023; Commencement Letter (CLDE) issued January 2026.
Phase / Site: Exeter Road site (near Dawlish Countryside Park)
Homes: 200 (30% affordable)
Developer: David Wilson Homes (Barratt)
Status: Planning application submitted autumn 2023.
Access: HIF link road and bridge over Shutterton Brook (connecting A379 to Elm Grove Road) completed winter 2024.
Construction traffic from the Gatehouse Farm site remains an ongoing issue for local residents (noted in March 2026 report).
TOTAL ACROSS ALL THREE SITES: Approximately 1,215 homes (200 + 160 + 755, with the DA2 total reaching 860 once all phases are delivered).
Report Post
Please Confirm
Details
Please