There is a TDC planning committe meeting on the 28th of this month.
This link should take you to its agenda http://www.teignbridge.gov.uk/article/21630/28-July-2015
Note agenda item 8.
Within those four links shown at agenda item 8, are documents which, amongst other things, say the following:
“a. Temporary SANGS
Suitable Alternative Natural Green Space (SANGS) is needed to relieve
visitor pressure on the Dawlish Warren SAC and the Exe Estuary SPA and
RAMSAR. SANGS is required in association with the implementation of
DA2 in order to meet its HRA requirements.
In order for the development at DA2 to progress a Temporary SANGS may
need to be provided ahead of the provision of the Dawlish Coastal Park
(DA7). As such, the SPD makes provision for a temporary SANGS to be
provided adjacent to the site (see section 3.8 of the draft SPD for further
details). This temporary measure will enable the timely delivery of the
development whilst mitigating the impacts identified in the SA/SEA and
HRA of the Local Plan.
b. Multipurpose building
Policy DA2 requires the delivery of a multipurpose building capable of
incorporating health and early years’ facilities. Through more detailed
assessments of need undertaken as part of the preparation of the draft SPD
it has become apparent that the health and early years element of the
multipurpose building can be better met through support for existing
facilities in Dawlish. In response, the SPD promotes the use of financial
contributions secured through S106 payments to support the existing facility
at the Red Rock Skills Centre and the Barton Surgery rather than provide a
bespoke facility.
c. Employment
Policy DA2 requires the provision of at least 3ha of land for employment
development. 3 hectares of employment land will be located in a single
area within and adjoining Development Area 4. In order to improve
deliverability of the employment land and access to the north of the site, the
employment land is shown partly inside the settlement limit with further
phases outside the settlement limit and with a separate access to the A379.
Provision in this location will enable clustering of business uses, economic
uses, economies of utilities provision and servicing, and minimise impact on
neighbouring uses. Development Area 4 is the most accessible part of the
DA2 allocation allowing commercial traffic to access directly off the A379.
Seeking to provide all of the employment land within the existing site would
necessitate complicated financial arrangements between landowners and would make its provision much less certain. “