900 homes proposed to be built in Dawlish 2013-2033.
Though you if you add in the 124 dwellings Strongvox development at Secmaton Rise and the 251 Cavanna/Bovis development at Secmaton Lane both of which are presently being built, the figure comes to 1,275. Add on various odds & sods developments here and there (I believe the technical term for them is windfall developments) over that period of time and let's say the figure will be 1,300 minimum.
(Since posting the above I've now read some more of these latest proposals re Dawlish and housing and it seems that the figure is more like 1,500. This is what TDC says:
"The planned allocation of 900 new homes plus about 640 new homes through existing planning commitments will provide a total of about 1500 new homes at Dawlish.")
Over the same period of time (2013-2033) TDC planners propose that Teignmouth should have a total of 340 new dwellings.
Please