This site uses cookies

ken

ken's Posts

So still no link road first, the whole mess is just one big F*** up by TDC and there has to be a clear out of the incompetents that work there starting with the Chief Executive.

@Gary Taylor yes by all means listen to the residents and from what flo is saying they would prefer the lanherne route rather than a crossing of the exeter road. once across the road they still have no easy route to town and lights at this point will result in traffic backing up around idesleigh. the words from tdc about "alternative onroad options" frighten me, does this mean a cycle lane around ...

@Morty Vicker when have i said that i do not want houses built near me, what i want is for the right type of houses built with connections to infrastructure that is fit for purpose and following the original teignbridge local plan from a link road that is built first in order to stop heavy construction traffic driving through residential estates and past schools or down single track lanes.

Doesn't moving the coach park to Barton simply move the pollution to Brunswick, a better idea would be make the crazy golf area into parking bays for coaches, move the crazy golf onto the lawn. By the bowling green. There's room by the crazy golf for 4 coaches at least in the centre of the town, near to loos for the drivers that aren't going to be closed any time now. In addition the drivers have ...

Maybe that's why SWW have been after Strongvox to make so many changes to the drainage system up there besides the problems with the pumping station.

@Gary yes a safer crossing, for pedestrians and mobility users, can be made at Lanherne by installing a pelican crossing, and I thought that was part of the "plan". But that is a stupid option as it simply adds to the congestion and polution around Idsleigh Terrace, the best option is to install a slope thro Lanherne down to Beach Street.  Do the people who make these decisions actually ever visit ...

5 May 2016

Gary how easy is it to get a coach up Brunswick and turn left at the top.

5 May 2016

Theres no work going on in the day either, drove past at 15:42 and all equipment closed up and nobody on site no wonder its going to take 6 months. Dont tell me they have to travel back to the depot to clock off, I have seen that excuse so many times before. I wonder what time they start?

You bet Lynne we are of the opinion that the Gatehouse Farm system will connect to the Bovis Cavanagh pipe and flow down Secmaton Lane. But who cares houses get built.

Documents gone But i've got a copy or two. How long before I get contacted by the TDC gestapo telling me to destroy it.  Makes good reading